"AMP Tower"

32nd Level, Sydney

This is one of two Kitchens that had the sub-floor primed and leveled to remove uneveness when the slab was poured and the old glue marks left from previous stuckdown carpet.


Click on images to zoom in.
This photo was taken just after the manufacturing waxes and excess glue was stripped off .
After one (1) coat of
Wetlook Glaser and sealer.
After two (2) coats of
Wetlook Glaser and sealer.
After three (3) coats of
Wetlook Glaser and sealer.
After four (4) coats of
Wetlook Glaser and sealer.