BACK
"Thredbo Village"
The Shand and Vidor Lodges.
The kitchens were installed with a special "White" WalkEasy Comcork Flooring, the lodges have under floor heating and care needed to be taken during installations.
Click on images to Zoom image.
It was cold, here is snow at 7am at our Accomodation inn.
The view from the Vidor lounge room.
Step (1)
A clean swept floor.
Step (2)
The kitchen floors have under floor heating and this was the first of two coats of a special featheredge cement levelling compound installed.
Step (3)
The floor after been stripped to remove the manufacturing waxes as well as marks, excess glue and dirt prior to applying sealer.
Step (4)
The finished Job coated with 3 coats of sealer with a wet look finish.
Go to Job Portfolio


This site is another creation of  www.madog.com , and is © 2002,