Unless stated otherwise. Per, SQ metre |
|
Installation Rates, Products and Services. | DOMESTIC |
COMMERCIAL |
1/ TAKE-UP, DISPOSAL and DUMPING of OLD FLOORCOVERINGS: | ||
Conventional Take-Up: (Smoothedge or Stapled installations) | ||
Carpet ONLY. | $2.00 | P.O.A. |
Carpet & Underlay. | $3.00 | P.O.A. |
Carpet, Underlay & Smoothedging (TIMBER Flooring) | $4.00 | P.O.A. |
Carpet, Underlay & Smoothedging (CONCRETE Flooring) | $4.50 | P.O.A. |
Carpet, Underlay & Double Smoothedging &/or Smoothedging under Skirting boards. | $5.50 | P.O.A. |
Direct Stick Take-Up: | ||
Peelable Glue: Carpet only. | $3.00 | P.O.A. |
Peelable Glue: Double Bonded Carpet & Underlay. | $6.00 | P.O.A. |
Pressure sensitive or Hi-Tack Glue: Carpet only. | $10.00 | P.O.A. |
Pressure sensitive or Hi-Tack Glue: Carpet & Underlay. | $15.00 | P.O.A. |
VINYL Sheeting or Tiles or Masonite: (inc. Floor Being Scraped & Staples been Flattened or Ground) | P.O.A. | P.O.A. |
Ceramic Tiles: ASK, as you may NOT have to Remove the OLD tiles !!! (Require Special, Acids,Primers & Cements to cover) | P.O.A. | P.O.A. |
CLEAN FLOOR: includes scrape, sweep &/or vacuum Floor prior to Installation.(Minimum FEE $40.00) | $1.00 | P.O.A. |
DISPOSAL of Old Floorcoverings & Underlay's, includes Disposal station Fee. (Minimum FEE $80.00) | $2.00 | P.O.A. |
2/ FLOORCOVERINGS INSTALLATIONS: (CUT, MAKE-UP, REPAIRS & SPECIAL INSTALLATIONS) | ||
MINIMUM SERVICE CHARGE. (CITY with PARKING) | $250.00 | |
MINIMUM SERVICE CHARGE. (CITY with NO PARKING) | $350.00 | |
MINIMUM SERVICE CHARGE. (INNER WEST SYDNEY AREAS) | $250.00 | |
MINIMUM SERVICE CHARGE. (OUTER METROPOLITAN AREAS) | $350.00 | |
CONVENTIONAL Piled Carpet Installation: | ||
4.00 & 3.66 metres wide. | $15.00~$20.00 | |
2.00 & 1.83 metres wide$. | $16.00~21.00 | |
COIR, SISAL, SEAGRASS & JUTE CARPETS: | ||
4.00, 3.66 or 1.83 metres wide carpet. | $15.00~$20.00 | |
STICK DOWN Installation: NOT including, ADHESIVES &/or GLUES: | ||
DOUBLE Bonded Installation. (Underlay glued to sub-floor & Carpet glued to underlay) | $18.00 | P.O.A. |
Single Bonded stick down of 4.00 & 3.66 metres wide carpet. | $12.00 | P.O.A. |
Single Bonded stick down of 2.00 & 1.83 metres wide carpet. | $14.00 | P.O.A. |
Single Bonded stick down of Less than 1.83 metres wide carpet. | $16.00 | P.O.A. |
SPECIAL Installation: | ||
BORDER and/or FEATURE Work. | $20.00 ~ $40.00 per Sq mt. | |
STAIRS & STEPS Installation: (Extra Labour) | per Step. | |
Boxed Stairs. | $15.00 | |
Boxed ANGLED Stairs. | $25.00 | |
TURNED & INLAYED Boxed Stairs. | $25.00 | |
TURNED & INLAYED ANGLED Stairs. | $35.00 | |
FRENCH PENCIL TUCKED Box Stairs. | $25.00 | |
FRENCH PENCIL TUCKED Angles Boxed Stairs & Landings. | $35.00 | |
TURNED & INLAYED & FRENCH PENCIL TUCKED Box Stairs. | $35.00 | |
TURNED & INLAYED & FRENCH PENCIL TUCKED Angles Stairs & Landings. | $45.00 | |
Wrap Around with Architectural Smoothedge. (Half or FULL Wrap Around) | $20.00 ~ $35.00 | |
Spiral Steps in TIMBER or STEEL. | $20.00 ~ $35.00 | |
Bull Nose. (Single or Double Ended Stair) | $25.00 ~ $50.00 | |
DRILLING & PLUGING Installation: (inc. Glue and Plugs as required) | per lineal metre | |
SMOOTHEDGING. (We ONLY Recommended Architectural Smoothedge) | $10.00 | |
TIMBER or ALIMINIUM Binder Bars. | $15.00 | |
ALIMINIUM Angles & ARCHECTURAL Finishes. | $15.00 | |
ALIMINIUM Angles CURVED/CIRCULAR Finishes. | $25.00 | |
3/ FLOOR-PREPARATIONS, RAMPING & LEVELLING CEMENTS: | ||
PRIMING SUB-FLOORS: NB: Price for for each application of "Primer" and WAITING time for Drying. | LABOUR | MATERIALS |
BLUE or PINK VIBRO Primer/Sealer for most Porous & Non Porous sub-floors. (INCLUDES: Sweeping, Vacuuming Floor & Primers) | $2.50 m2 | $2.50 m2 |
NEOPRENE Primer, to Cover old Ceramic tiles or smooth surfaces etc.. (INCLUDES: Sweeping, Vacuuming Floor & Primers if required) | $5.00 m2 | $2.50 m2 |
FEATHER FINISH CEMENT: Thin application Leveling cement: Used to cover Neoprene or Old Glue, 4 mm Max Thickness. | P.O.A. | $50.00 Bag |
ARDEX Z-8 ARDIT: Leveling Cement: 4 mm Maximum Application Thickness. | $100.00 Bag | $50.00 Bag |
ARDEX K-15 ARDRON: Leveling Cement: No Maximum Application Thickness. | $100.00 Bag | $50.00 Bag |
ARDEX K-45 RAPID-SET CEMENTS: Ramping or Leveling: Can Set in 15 Minutes & Installed over in 45 Minutes. | $100.00 Bag | $55.00 Bag |
MASONITE SHEETING: Termite resistant (Brown wood type compounds) | $20.00 m2 | $10.00 m2 |
FIBRO SHEETING: Heavy Grade Sheeting for Higher than Normal Moisture areas. (INCLUDES: Feather Finish Cement to joins) | $25.00 m2 | $10.00 m2 |
4/ GLUES & ADHEASIVES for CARPET & VINYL: | ||
Solvent based glues for most types of Natural Floorcovering Installation & sub-floor. | From $4.00~$6.00 | |
5/ UNDERLAYS & PADDINGS: | ||
RUBBER Underlay: | ||
Black/Gold Light Weight Waffle Rubber. (Domestic) NB: NOT recommended at all ! | N.L.A. | N.L.A. |
Green Medium Duty Waffle Rubber. (Light Commercial) | N.L.A. | N.L.A. |
Blue Heavy Duty Waffle Rubber. (Commercial) | $11.00 | P.O.A. |
Double Bonded RUBBER Underlay: | ||
Airstep Suporta Pad 3.7mm (Industrial Slab Rubber) NB: NOT to used with Smoothedge, the thinness causes a stepping up effect. | $8.00 | P.O.A. |
Airstep Sensi Slab 4.7mm (Industrial Slab Rubber) | $11.00 | P.O.A. |
Airstep Aero Cushion 7.0mm (Industrial Slab Rubber) | $15.00 | P.O.A. |
Re-Bonded FOAM Underlay: | ||
Ultra-Lay 3.5mm (Industrial Slab Rubber) NB: NOT to used with Smoothedge as the thinness will cause perimeter stepping up effect. | $8.00 | P.O.A. |
Opra-Lay 6.0mm (Industrial Slab Rubber) | $10.00 | P.O.A. |
Gym-Lay 8.0mm (Industrial Slab Rubber) | $12.00 | P.O.A. |
WOOL & TEXTILE BLENDED Underlay: We Recommended this underlay before any "HAIR & FELT Underlay". | ||
CUSHION PAD 9mm 30% WOOL (HEAVY DUTY) | $10.00 | P.O.A. |
PREMIER PAD 15 mm 30% WOOL (EXTRA HEAVY DUTY) | $15.00 | P.O.A. |
HAIR & FELT BLENDED Underlay: | ||
H/Duty 6 lb = 60% Hair & 40% Felt | N.L.A. | P.O.A. |
Super H/Duty 7 lb = 60% Hair & 40% Felt | N.L.A. | P.O.A. |
DELUXE Super Soft & H/Duty 8 lb = 60% Hair & 40% Felt | N.L.A. | P.O.A. |
6/ SMOOTHEDGING: (SUPPLY & FITTING CHARGE, Per lineal metre) | Per, linear METRE. | |
STANDARD Domestic Smoothedge, Fitted to Concrete or Timber floor. (ONLY installed Behind an existing row of Domestic Smoothedging) | $3.00 | P.O.A. |
INDUSTRIAL ARCHITECTURAL Smoothedging, Fitted to Concrete or Timber floor. (We ONLY Recommended this type of Smoothedge) | $3.00 | P.O.A. |
MaxiBond & Nail Down ARCHITECTURAL Smoothedging, Fitted to Hard /Damaged or Bad Concrete or Timber floor areas. | $5.00 | P.O.A. |
DRILL & PLUGING of ARCHITECTURAL Smoothedging (MaxiBonded if Required), Fitted to Excessively Hard or Damaged Concrete floor areas. | $10.00 | P.O.A. |
7/ DOOR BARS & ALUMINIUM ANGLES & SKIRTING: (DOORWAYS, RAMPING, OPEN AREAS & INLAYS) | Per, linear METRE. | |
Standard Domestic Naplocks (NOT USED as considered inferior) | N.L.A. | |
Heavy Duty Industrial Naplocks | $20.00 | |
Natural Timber Ramped Bars, Uncoated finish (Inc. Gluing down, Nailing &/or Drill & Plug Fixing as required) | $25.00 | |
Aluminium Angles: TIMBER FLOORS (Inc. Gluing down and Drill & Screw Fixing) | $15.00 | |
Aluminium Angles: CONCRETE FLOORS (Inc. Gluing down and Drill & Plug Fixing) | $25.00 | |
Aluminium Angles: CONCRETE FLOORS with CURVED RADIUS (Inc. Gluing down and Drill & Plug Fixing) | $35.00 | |
VINYL SKIRTING or COVING: | ||
100mm Plain Flat Skirting Installed. (3/6) | $9.00 mt | |
100mm Feather Edge Skirting Installed. (3/7) | $10.00 mt | |
8/ LABOUR RATE & OUT of HOURS LOADING: (STARTS AFTER 3pm, MINIUM 4 hr PAID SHIFT) | Per; Person / Shift. | |
Journeyman Labour Rate. | $35.00 per hour. | |
CRAFTSMAN Labour Rate. | $50.00 per hour. | |
MASTER CRAFTSMAN Labour Rate. ...NO LOADING just 24/7 rate ! | $100.00 per hour. | |
For After 3pm Start OR Weekend OR Public Holidays. | $100.00 Shift + hourly rate. | |
9/ SURCHARGES, TRAVEL & AWAY ALLOWANCES: | Per; KILOMETRE. | |
SYDNEY METRO Areas: see (*) |
+$100 Day | |
Any work carried out in CBD & North Sydney area $100.00 per day Surcharge. |
+$100 Day | |
Any job past Parramatta to the west, Sutherland to the south, the Spit Bridge to the north will incur $100.00 per day loading. |
+$100 Day | |
10/ AIR FAIRS, ACCOMODATION & AWAY ALLOWANCES: AUSTRALIA / INTERNATIONAL (#) | Per; Person / Day. | |
ALL DRIVE AWAY JOBS Outside METRO Areas: Carries a one-way road charge from Sydney GPO to your location. | $2.00 km +$100 Day | |
Accommodation and Meal Allowances. (depending on area & time of year) | $100.00 ~ $250.00 | |
Air Fares inc. Return fares with excess baggage for Tools. (eg. Brisbane/Melbourne = $500, may vary depending on area & time of year) | $500.00 ±-$200 Tools | |
Please call to confirm these Prices. Updated, 07-Dec-2017 .
|